Understanding the structural differences and knowing which product fits your project.
| Bridging Finance | Development Finance | |
|---|---|---|
| Purpose | Short-term capital for acquisitions, refurbishment or transitional needs | Funding construction or major conversion projects |
| Loan Term | Typically 1–24 months | Typically 12–36 months |
| Drawdown | Usually a single advance at outset | Drawn in stages as construction progresses |
| Basis of Lending | Loan-to-Value (LTV) of current or 90-day value | Loan-to-Cost (LTC) and Gross Development Value (GDV) |
| Monitoring | Generally not required | Monitoring surveyor required to verify progress |
| Typical LTV/LTC | Up to ~75% LTV | Up to ~70% LTC / ~65% GDV |
| Planning Required | Not always | Usually required before first drawdown |
| Exit Strategy | Sale or refinance | Sale of completed units or refinance |
Bridging finance is best suited to projects where the primary need is speed or short-term capital — rather than ongoing construction funding.
Development finance is the appropriate product where the project involves significant construction or conversion — where funding needs to be released in stages as the project progresses.
Bridging finance is typically advanced as a single sum at the start of the loan. Development finance is drawn in tranches as construction milestones are reached — each drawdown is triggered by a monitoring surveyor's report confirming progress.
Bridging loans are sized as a percentage of current property value (LTV). Development loans are typically sized as a percentage of total project cost (LTC) and capped at a percentage of the completed Gross Development Value (GDV).
Bridging finance generally does not require ongoing monitoring once the loan is drawn. Development finance lenders appoint an independent monitoring surveyor who reviews and approves each drawdown request, adding a layer of cost and process to the transaction.
Bridging finance can sometimes be arranged before planning permission is in place — for example, to fund an acquisition while a planning application is pending. Development finance lenders typically require detailed planning consent before the first construction drawdown.
Development finance tends to carry arrangement fees and monitoring costs in addition to interest. Bridging finance has a simpler cost structure, though the monthly rate can be comparable or higher depending on the risk profile of the transaction.
Choosing between bridging finance and development finance is not always straightforward. The right answer depends on the nature of the project, the scope of works, the required drawdown structure and the planned exit.
At 3 Trees Finance, we can help you understand the options and connect you with specialists who have experience across both products and across a wide range of project types.
Contact Us
Tell us about your project and we can help identify the most appropriate funding solution.
Explore Further
Short-term funding for acquisitions, refinancing and refurbishment projects.
Learn MoreFunding solutions for residential, commercial and mixed-use development projects.
Learn MoreFast funding designed to meet the demanding timescales of auction purchases.
Learn MoreRefinancing and restructuring solutions for existing property portfolios.
Learn MoreSpecialist funding for Houses in Multiple Occupation.
Learn MoreFunding for Multi-Unit Freehold Blocks under a single freehold title.
Learn More